Our Cardano Stake Pool runs on a single 10th Generation
Intel NUC, with an average power draw of less than 15 watts

AdaNet.io's Energy-efficient Intel NUC Cluster

Energy Efficient

ANET Stake Pool has an average power draw of less than 15 watts

We've been extremely satisfied with our stake pool's move from a Xeon server to the impressively efficient Intel NUC. We ran the monitor for 24-hours, with Cardano Node v1.26.1, and averaged just under 15 watts ;)


NUC-Cluster

Our Setup

  • Dedicated Enterprise Firewall + VPN
  • Hexa-core Intel i7 (10th Gen)
  • 64 GB DDR4 RAM
  • M.2 NVMe 3500 / 3300 MB/s V-NAND SSD
  • Gigabit Fiber Optic Internet Uplink
  • APC Smart-UPS Networked Backup Power
  • Generator backed power grid
  • Automated System Imaging / Backup
  • Failover to Relay Node (Hot Spare)
  • Penetration Tested Network and Nodes
  • 24 / 7 Monitoring

Copyright © 2024 AdaNet.io. All rights reserved.